Sunday, October 19, 2008

Surviving the Remodel

In July, the night before we were to leave for Yellowstone, we went to bed at 10:00 p.m. It was raining hard outside but really didn't think to much of it except we were worried about Tiffanee's getting home safely. When she arrived home at 11:00 p.m. I stepped out of bed to see her and found myself in an inch of water. The rain came down so hard that it had run over our foundation and into our sunken bedroom. This all started a major remodeling project at our house, which lasted more than 9 weeks and was a little frustrating. Especially with remodeling both bathrooms at the same time, we had a working sink in one bathroom and a functioning toilet in the other, with holes in the wall between both. It made a bit interesting. Barring wanting to sometimes dismiss the crazy contractor, things have turned out and we are almost done.




The new hall bath!



Tiffanee's New Bedroom


The Master Bath





New Carpet - Goodbye to the Green!

1 comment:

Amber said...

I love it mom! It looks so great!